Mai Manga M., Bazin C., Renaud M., 2012. Effect of damaged liners and roping on classification performed by 6 inch hydrocyclone, Can. Met. Quart., Under press.
Bazin C., G. M. Payenzo, Desnoyers M., Gosselin C., Chevalier G., 2012. The use of simulation for process diagnosis: Application to a gravity separator, Int. J. Miner. Process., 104-105, 20, pp 11-16.
Bazin C., Renaud M., Faucher A., Mai Manga M., 2011. Advantages and methods for the real time detection of hydrocyclone operating problems, CIM Journal, 2 (3), pages 143-154.
Blanchette G., Bazin C., Blatter P., 2010. Estimation of Gold Inventory in Large Carbon in Leach Tanks, Minerals Engineering, 24 (6), 551-558.
Bazin C., El-Ouassiti K., Ouellet V., 2007. Sequential leaching for the recovery of alumina from a Canadian clay, Hydrometallurgy, Vol. 88, 1-4, August, pp. 196-201.
Bazin C., Obiang P., 2007 Should slurry density be adjusted as a function of grinding media size, Minerals Engineering, Vol. 20 (8), pp. 807-815.
Bazin C., Hodouin D., Zouadi M., 2005. Data reconciliation and equilibrium constant estimation: Application to copper solvent extraction, Hydrometallurgy, 80, pp. 43-53.